Three Distinct Low-Noise Chiller Packages
In deep collaboration with Daikin engineering, Parklane designed a series of fully integrated attenuation package from the ground up. Every element — from airflow optimization and chiller performance to structural integrity, serviceability, acoustic performance, and ease of installation — was optimized to deliver three low-noise solutions.
Low-Noise Chiller 1
Discharge attenuation package to attenuate the fan deck, while maintaining full service access.
Low-Noise Chiller 2
Increased discharge attenuation to optimized site performance with acoustic screening.
Low-Noise Chiller 3
Discharge attenuation with hinged inlet louvers that open for full service access.
System Benefits
Simplified Site Engineering
By providing 5-sided spectral sound power levels, Acoustic Engineers can optimize the site to minimize attenuation costs. Full 500+ ton capacity packages negate the need for CFD Engineers to factor in de-rate.
Complete Solution
End users receive a fully-integrated solution with all design elements having been vetted through the product engineering process – eliminating the potential for downstream adjustments.
Factory Approved
Solutions are factory approved to avoid the unnecessary costs and time involved with engineering and OEM alignment—while ensuring all attenuation measures remain fully compatible with warranty requirements.
Maintain Serviceability
Through deep coordination with the Daikin service teams and IOMs, the system has been designed to maintain access to all components for service and maintenance.
Reduced Lead-Time
These solutions are engineered and validated up front, removing the back-and-forth between acoustic consultants and CFD engineers—saving weeks of review time and cost.
Simplified Procurement
No need to coordinate multiple vendors, align lead times, or work on vendor approvals. The low-noise solutions are a standard equipment offering direct from Daikin.
Modular Design
The attenuation is delivered prefabricated and factory-assembled, minimizing labor costs, installation risks, and project timelines. Design and delivery coordination ensure simple installation.